Land Rats on a Bartered Sailboatvideo

Getting the mast ready to put on the boat. Rigging, Ropes & More | Land Rats | EP42

May 16, 2021 · 14 min · 347 views · Durban

What this video covers

Preparation for stepping a mast at the Bluff Yacht Club in Durban, South Africa, involves inspecting standing rigging for structural integrity and replacing worn running rigging.0:19 To identify potential fatigue, the crew uses a three-part Spanjart dye penetrant system on stainless steel fittings, cleaning the metal before applying a penetrant, followed by a developer to highlight surface cracks.0:53 While some fittings show red staining, the crew attributes these marks to surface rust or minor indentations rather than structural fractures.8:02 The project also includes adjusting the spreader angle to a 6-degree bend using a protractor template and securing the rigging to the spreaders with seizing wire, which the crew sourced locally after a multi-day search.9:43 Additionally, the team reassembles the roller furling system, clearing out all spare parts except for one bolt requiring a thread tap.13:34

Watch on YouTube

More from Land Rats on a Bartered Sailboat

Sailing across country borders, International Sailing, South Africa to Namibia | Land Rats | EP70Jul 2022Exploring Richards bay and sailing back to Durban | Land Rats | EP60Oct 2021Offshore Sailing, first passage on our Steel boat, Durban to Richards Bay | Land Rats | EP59Oct 2021Out SailingSep 2021

From Land Rats on a Bartered Sailboat — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue