Getting the mast ready to put on the boat. Rigging, Ropes & More | Land Rats | EP42
16 de mayo de 2021 · 14 min · 347 visitas · Durban
Qué cubre este vídeo
Preparation for stepping a mast at the Bluff Yacht Club in Durban, South Africa, involves inspecting standing rigging for structural integrity and replacing worn running rigging.0:19 To identify potential fatigue, the crew uses a three-part Spanjart dye penetrant system on stainless steel fittings, cleaning the metal before applying a penetrant, followed by a developer to highlight surface cracks.0:53 While some fittings show red staining, the crew attributes these marks to surface rust or minor indentations rather than structural fractures.8:02 The project also includes adjusting the spreader angle to a 6-degree bend using a protractor template and securing the rigging to the spreaders with seizing wire, which the crew sourced locally after a multi-day search.9:43 Additionally, the team reassembles the roller furling system, clearing out all spare parts except for one bolt requiring a thread tap.13:34
Más de Land Rats on a Bartered Sailboat
De Land Rats on a Bartered Sailboat — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



