Sailing Yabávideo

Davit Complete and Dinghy Onboard: Yabá Gets Ready to Sail! — Sailing Yabá 254

23. desember 2024 · 29 min · 61K visninger

Hva denne videoen dekker

The crew of Yabá completes the installation of a custom stainless steel davit system and a new rail-mounted barbecue in preparation for a coastal passage. Fabricators welded the davit structure while the boat remained under a protective cover in a shipyard to mitigate wind interference.1:46 The crew tests the davit’s lifting capacity using a temporary 3:1 block-and-tackle system to hoist the dinghy onto the stern platform.22:21 To secure the dinghy, they install stainless steel rings and cleats, reinforcing the mounting points with backing plates and sealant.10:55 The new barbecue features a custom-welded mount designed to prevent heat damage to the fiberglass platform.18:30 Final preparations for departure include organizing loose interior gear and securing the dinghy to ensure it does not obstruct the rudder during transit.27:31 The crew plans to refine the davit’s pulley ratios and mounting hardware after reaching their next destination.26:04

Se på YouTube

Mer fra Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaug. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem