Sailing Yabávidéo
Davit Complete and Dinghy Onboard: Yabá Gets Ready to Sail! — Sailing Yabá 254
23 décembre 2024 · 29 min · 61K vues
Ce que couvre cette vidéo
The crew of Yabá completes the installation of a custom stainless steel davit system and a new rail-mounted barbecue in preparation for a coastal passage. Fabricators welded the davit structure while the boat remained under a protective cover in a shipyard to mitigate wind interference.1:46 The crew tests the davit’s lifting capacity using a temporary 3:1 block-and-tackle system to hoist the dinghy onto the stern platform.22:21 To secure the dinghy, they install stainless steel rings and cleats, reinforcing the mounting points with backing plates and sealant.10:55 The new barbecue features a custom-welded mount designed to prevent heat damage to the fiberglass platform.18:30 Final preparations for departure include organizing loose interior gear and securing the dinghy to ensure it does not obstruct the rudder during transit.27:31 The crew plans to refine the davit’s pulley ratios and mounting hardware after reaching their next destination.26:04
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



