Sailing Yabávídeo

Davit Complete and Dinghy Onboard: Yabá Gets Ready to Sail! — Sailing Yabá 254

23 de dezembro de 2024 · 29 min · 61K visualizações

O que este vídeo aborda

The crew of Yabá completes the installation of a custom stainless steel davit system and a new rail-mounted barbecue in preparation for a coastal passage. Fabricators welded the davit structure while the boat remained under a protective cover in a shipyard to mitigate wind interference.1:46 The crew tests the davit’s lifting capacity using a temporary 3:1 block-and-tackle system to hoist the dinghy onto the stern platform.22:21 To secure the dinghy, they install stainless steel rings and cleats, reinforcing the mounting points with backing plates and sealant.10:55 The new barbecue features a custom-welded mount designed to prevent heat damage to the fiberglass platform.18:30 Final preparations for departure include organizing loose interior gear and securing the dinghy to ensure it does not obstruct the rudder during transit.27:31 The crew plans to refine the davit’s pulley ratios and mounting hardware after reaching their next destination.26:04

Assistir no YouTube

Mais de Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabáset. de 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabáset. de 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabáset. de 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago. de 2026

De Sailing Yabá — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema