Acorn To Arabellavideo
Only One Week To Get Ready for Sailing - Episode 321 - Acorn to Arabella: Journey of a Wooden Boat
15. november 2024 · 25 min · 55K visninger · Maine
Hva denne videoen dekker
The crew of the wooden boat Arabella completes a series of maintenance and rigging projects in Maine to prepare for a southward passage before winter.Watch Steve mounts rigid solar panels to the shrouds using custom-made spreaders that double as ratlines for mast access.0:53 To run the wiring, he drills a 5/8-inch hole through the locust covering boards, carefully avoiding the chain plate backing blocks and deck beams.14:10 Other tasks include fiberglassing a new dodger top, sewing lee cloths for the workbench, and replacing climbing slings on the deadeyes with Dyneema.1:59 A professional diver, Murray, cleans the hull and inspects the underwater seams, confirming the vessel’s structural integrity.20:30 The crew also assists local residents Pete and Edie with recreational lobster trapping, using herring as bait and adhering to size and sex regulations.5:46 These final preparations occur while docked at a private residence in Maine, providing the necessary shore power and workspace to ready the boat for the upcoming transit.24:20
Mer fra Acorn To Arabella
Fra Acorn To Arabella – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



