Acorn To Arabellavídeo

Only One Week To Get Ready for Sailing - Episode 321 - Acorn to Arabella: Journey of a Wooden Boat

15 de novembro de 2024 · 25 min · 55K visualizações · Maine

O que este vídeo aborda

The crew of the wooden boat Arabella completes a series of maintenance and rigging projects in Maine to prepare for a southward passage before winter.Watch Steve mounts rigid solar panels to the shrouds using custom-made spreaders that double as ratlines for mast access.0:53 To run the wiring, he drills a 5/8-inch hole through the locust covering boards, carefully avoiding the chain plate backing blocks and deck beams.14:10 Other tasks include fiberglassing a new dodger top, sewing lee cloths for the workbench, and replacing climbing slings on the deadeyes with Dyneema.1:59 A professional diver, Murray, cleans the hull and inspects the underwater seams, confirming the vessel’s structural integrity.20:30 The crew also assists local residents Pete and Edie with recreational lobster trapping, using herring as bait and adhering to size and sex regulations.5:46 These final preparations occur while docked at a private residence in Maine, providing the necessary shore power and workspace to ready the boat for the upcoming transit.24:20

Ver no YouTube

Mais de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Again10/2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabella09/2026Upgrading the Rudder and Another Trek To The Cliff08/2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coast07/2026

De Acorn To Arabella — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema