Acorn To Arabellavideo

Only One Week To Get Ready for Sailing - Episode 321 - Acorn to Arabella: Journey of a Wooden Boat

15 November 2024 · 25 min · 55K views · Maine

What this video covers

The crew of the wooden boat Arabella completes a series of maintenance and rigging projects in Maine to prepare for a southward passage before winter.Watch Steve mounts rigid solar panels to the shrouds using custom-made spreaders that double as ratlines for mast access.0:53 To run the wiring, he drills a 5/8-inch hole through the locust covering boards, carefully avoiding the chain plate backing blocks and deck beams.14:10 Other tasks include fiberglassing a new dodger top, sewing lee cloths for the workbench, and replacing climbing slings on the deadeyes with Dyneema.1:59 A professional diver, Murray, cleans the hull and inspects the underwater seams, confirming the vessel’s structural integrity.20:30 The crew also assists local residents Pete and Edie with recreational lobster trapping, using herring as bait and adhering to size and sex regulations.5:46 These final preparations occur while docked at a private residence in Maine, providing the necessary shore power and workspace to ready the boat for the upcoming transit.24:20

Watch on YouTube

More from Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... AgainOct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired ArabellaSept 2026Upgrading the Rudder and Another Trek To The CliffAug 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastJul 2026

From Acorn To Arabella — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue