Wicked Saltyvideo

Can I say it worked?

16. juni 2023 · 7 min · 5K visninger

Hva denne videoen dekker

Wes and Kate prepare their boat for an upcoming rigging installation and launch. Wes confirms the outboard engine runs after a repair involving JB Weld, though he notes the oil level remains slightly above the full line after a recent change.2:42 He plans to monitor the level after the engine runs and the filter fills.5:24 The bilge pump requires a new butt connector because the float switch failed to activate; Wes intends to crimp a new connection once he retrieves his tools.6:38 Other maintenance tasks include tightening hose clamps, adjusting belt tension, and replacing the air filter.6:25 Wes expresses concern that the boatyard will launch the vessel immediately after stepping the mast, leaving him insufficient time for a final buff and wax.5:53 Heavy smoke from Canadian wildfires currently limits visibility to two or three miles in the area.2:52

Se på YouTube

Mer fra Wicked Salty

Sailing back to Safe Harbor with SAILS ONLYjuli 2023THINKING OF BUYING A BOAT WATCH THIS!juli 2023The boys go canoeing and camping (GONE CRAZY)juni 2023PREPARING THE SAILBOAT FOR LAUNCHmai 2023

Fra Wicked Salty – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem