Wicked Saltyvídeo

Can I say it worked?

16 de junio de 2023 · 7 min · 5K visitas

Qué cubre este vídeo

Wes and Kate prepare their boat for an upcoming rigging installation and launch. Wes confirms the outboard engine runs after a repair involving JB Weld, though he notes the oil level remains slightly above the full line after a recent change.2:42 He plans to monitor the level after the engine runs and the filter fills.5:24 The bilge pump requires a new butt connector because the float switch failed to activate; Wes intends to crimp a new connection once he retrieves his tools.6:38 Other maintenance tasks include tightening hose clamps, adjusting belt tension, and replacing the air filter.6:25 Wes expresses concern that the boatyard will launch the vessel immediately after stepping the mast, leaving him insufficient time for a final buff and wax.5:53 Heavy smoke from Canadian wildfires currently limits visibility to two or three miles in the area.2:52

Ver en YouTube

Más de Wicked Salty

Sailing back to Safe Harbor with SAILS ONLYjul 2023THINKING OF BUYING A BOAT WATCH THIS!jul 2023The boys go canoeing and camping (GONE CRAZY)jun 2023PREPARING THE SAILBOAT FOR LAUNCHmay 2023

De Wicked Salty — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema