Wicked Saltyvídeo

Can I say it worked?

16 de junho de 2023 · 7 min · 5K visualizações

O que este vídeo aborda

Wes and Kate prepare their boat for an upcoming rigging installation and launch. Wes confirms the outboard engine runs after a repair involving JB Weld, though he notes the oil level remains slightly above the full line after a recent change.2:42 He plans to monitor the level after the engine runs and the filter fills.5:24 The bilge pump requires a new butt connector because the float switch failed to activate; Wes intends to crimp a new connection once he retrieves his tools.6:38 Other maintenance tasks include tightening hose clamps, adjusting belt tension, and replacing the air filter.6:25 Wes expresses concern that the boatyard will launch the vessel immediately after stepping the mast, leaving him insufficient time for a final buff and wax.5:53 Heavy smoke from Canadian wildfires currently limits visibility to two or three miles in the area.2:52

Ver no YouTube

Mais de Wicked Salty

Sailing back to Safe Harbor with SAILS ONLY07/2023THINKING OF BUYING A BOAT WATCH THIS!07/2023The boys go canoeing and camping (GONE CRAZY)06/2023PREPARING THE SAILBOAT FOR LAUNCH05/2023

De Wicked Salty — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema