Sail Lifevideo

⛵️Container workshop: steel reinforcements, rockwool, and OSB. Ep 649

5. oktober 2025 · 21 min · 76K visninger

Hva denne videoen dekker

Mads reinforces a 40-foot shipping container workshop by installing steel angle iron and spreader plates to support a CNC hoist.2:59 He uses a magnetic drill to bore holes for the steel components and a 3.25-inch forged eye bolt.3:10 To insulate the 16-foot office section, he applies spray foam to the walls and ceiling, followed by R15 rockwool batts.6:34 He chooses OSB over drywall for the interior ceiling and walls to prevent cracking during potential future transport of the container.11:38 A drywall lift assists in positioning the OSB sheets, which he secures with coarse-thread drywall screws.11:29 To manage condensation and future electrical modifications, he plans to run all wiring on the interior surface of the walls rather than behind the insulation.18:31 He defers floor insulation to mitigate potential damage from hurricane-related flooding.18:13 The project concludes with plans to frame a standard double-door opening and install unistrut for future utility mounting.19:28

Se på YouTube

Båter i denne videoen

Antares Yachts 44Deres båt

Mer fra Sail Life

The road back to boat work: moving into the workshop & our conex moving choices. Ep. 690aug. 2026The road back to boat work: The bunker, hidden bookcase door & bad news. Ep. 689aug. 2026The road back to boat work: Trash pit and new a $%*& gorgeous DIY dining room table Ep. 688juli 2026The road back to boat work: Floors, paint, and tool trailer Ep. 687juli 2026

Fra Sail Life – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem