Sail Lifevidéo
⛵️Container workshop: steel reinforcements, rockwool, and OSB. Ep 649
5 octobre 2025 · 21 min · 76K vues
Ce que couvre cette vidéo
Mads reinforces a 40-foot shipping container workshop by installing steel angle iron and spreader plates to support a CNC hoist.2:59 He uses a magnetic drill to bore holes for the steel components and a 3.25-inch forged eye bolt.3:10 To insulate the 16-foot office section, he applies spray foam to the walls and ceiling, followed by R15 rockwool batts.6:34 He chooses OSB over drywall for the interior ceiling and walls to prevent cracking during potential future transport of the container.11:38 A drywall lift assists in positioning the OSB sheets, which he secures with coarse-thread drywall screws.11:29 To manage condensation and future electrical modifications, he plans to run all wiring on the interior surface of the walls rather than behind the insulation.18:31 He defers floor insulation to mitigate potential damage from hurricane-related flooding.18:13 The project concludes with plans to frame a standard double-door opening and install unistrut for future utility mounting.19:28
Bateaux dans cette vidéo
Plus de vidéos de Sail Life
De Sail Life — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



