Gone with the Wynnsvideo

What Happened To Our New Catamaran?

15. september 2024 · 31 min · 867K visninger · Cebu

Hva denne videoen dekker

The owners of a new HH catamaran spent five and a half weeks in a Cebu, Philippines, shipyard to address warranty issues and construction defects on hull number three.0:10 The vessel required a haul-out at the Ossal facility to rectify electrical current leakage caused by improper bonding of mixed metals, which had resulted in excessive pitting and rust on deck hardware and engine anodes.1:50 Additional repairs included replacing delaminating solar panels with upgraded Gen 2 versions, installing a higher-performance mainsail halyard to reduce friction, and re-routing lazy jacks to prevent snagging on battens.16:16 The crew also addressed propeller pitch adjustments, added antifouling paint to the transoms, and corrected gelcoat and fiberglass finishing work.20:35 The shipyard process was complicated by strict security protocols at the defense-contracting facility, which limited filming and access.2:06 Following the repairs, the owners performed sea trials to test electric motor efficiency and rig tension.7:22 The experience highlights the necessity of a shakedown period for new-design vessels to identify and resolve teething issues through manufacturer warranty support.

Se på YouTube

Mer fra Gone with the Wynns

This Cost a Fortune... We Removed It Anywayjuni 2026We Thought We'd Never See These Againmai 2026600 Miles Across the Most Feared Ocean on Earthmai 2026Ice Camping Overnight on Antarcticamai 2026

Fra Gone with the Wynns – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem