Sam Holmes Sailingvideo

Back to Malaysia to drill the first holes in my catamaran & other projects

13. juli 2025 · 36 min · 127K visninger

Hva denne videoen dekker

Sam Holmes refits a catamaran in Malaysia, focusing on electrical, mechanical, and cosmetic upgrades before a planned passage to Thailand. He installs a mini-split air conditioner by mounting the indoor unit on a custom PVC foam board bracket behind the mast support post and placing the outdoor unit in a forward hatch. After struggling with a faulty flare tool, he successfully connects the gas lines. He also services the windlass, replacing a faulty relay to restore both up and down functions, and installs new control buttons by drilling and epoxy-sealing holes in the deck. Additional tasks include splicing a Starlink cable with a 12-volt to 24-volt step-up converter, greasing the Yamaha outboard steering shaft, and replacing the boat's name on the transom. He tests a Garmin messenger device for satellite communication and clears out excess spare parts and outdated paper charts. The air conditioner draws significant power, indicating a need for additional solar capacity. Proper sealing of deck penetrations with epoxy ensures watertight integrity when mounting new hardware.

Se på YouTube

Mer fra Sam Holmes Sailing

Orca sighting! we repair one daggerboard only to break another onesep. 2026Sailing to Maratua, a rarely visited Indonesian island sep. 2026We hit a log sailing by strange Indonesian sea platformsaug. 2026Replacing a window while sailing through pirate waters and wildlife of Borneoaug. 2026

Fra Sam Holmes Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem