Sam Holmes Sailingvídeo
Back to Malaysia to drill the first holes in my catamaran & other projects
13 de julio de 2025 · 36 min · 127K visitas
Qué cubre este vídeo
Sam Holmes refits a catamaran in Malaysia, focusing on electrical, mechanical, and cosmetic upgrades before a planned passage to Thailand. He installs a mini-split air conditioner by mounting the indoor unit on a custom PVC foam board bracket behind the mast support post and placing the outdoor unit in a forward hatch. After struggling with a faulty flare tool, he successfully connects the gas lines. He also services the windlass, replacing a faulty relay to restore both up and down functions, and installs new control buttons by drilling and epoxy-sealing holes in the deck. Additional tasks include splicing a Starlink cable with a 12-volt to 24-volt step-up converter, greasing the Yamaha outboard steering shaft, and replacing the boat's name on the transom. He tests a Garmin messenger device for satellite communication and clears out excess spare parts and outdated paper charts. The air conditioner draws significant power, indicating a need for additional solar capacity. Proper sealing of deck penetrations with epoxy ensures watertight integrity when mounting new hardware.
Más de Sam Holmes Sailing
De Sam Holmes Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



