Sam Holmes Sailingvidéo

Back to Malaysia to drill the first holes in my catamaran & other projects

13 juillet 2025 · 36 min · 127K vues

Ce que couvre cette vidéo

Sam Holmes refits a catamaran in Malaysia, focusing on electrical, mechanical, and cosmetic upgrades before a planned passage to Thailand. He installs a mini-split air conditioner by mounting the indoor unit on a custom PVC foam board bracket behind the mast support post and placing the outdoor unit in a forward hatch. After struggling with a faulty flare tool, he successfully connects the gas lines. He also services the windlass, replacing a faulty relay to restore both up and down functions, and installs new control buttons by drilling and epoxy-sealing holes in the deck. Additional tasks include splicing a Starlink cable with a 12-volt to 24-volt step-up converter, greasing the Yamaha outboard steering shaft, and replacing the boat's name on the transom. He tests a Garmin messenger device for satellite communication and clears out excess spare parts and outdated paper charts. The air conditioner draws significant power, indicating a need for additional solar capacity. Proper sealing of deck penetrations with epoxy ensures watertight integrity when mounting new hardware.

Regarder sur YouTube

Plus de vidéos de Sam Holmes Sailing

Kota Kinabalu Bound: Sailing, Survivor Island, Squalls, and Bugs, 3d printingjuil. 2026Sailing to Brunei, an unusual countryjuil. 2026Sailing Through an OIL RIG MAZE to Miri, Borneojuil. 2026Becalmed & our engines keep breaking on 7 day passage to Borneojuin 2026

De Sam Holmes Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème