Sail Lifevideo
⛵️ DIY Container Workshop: Ava is back in town! Floors, insulation, paneling, and paint. Ep 652
26. oktober 2025 · 23 min · 75K visninger
Hva denne videoen dekker
Mads and Ava finish the interior build-out of a 40-ft shipping container workshop, installing insulation, flooring, paneling, and a partition door. To insulate the office floors, they install firring strips, 1.5-inch XPS foam, and OSB subflooring, sealing gaps with spray foam to prevent condensation.3:03 For the walls and ceiling, they install faux shiplap paneling using a drywall hoist and construction adhesive.8:38 A solid-core pre-hung door separates the workshop from the office, with shims used to ensure the frame is plumb before securing it with 3-inch screws.12:48 Mads runs electrical wiring through EMT conduit for an industrial aesthetic, while Ava finishes the interior with paint.14:21 The project concludes with the installation of luxury vinyl plank flooring.16:43 The build utilizes a WaterSaw, a foldable tool compatible with standard reciprocating saw blades, for cutting foam and other materials.18:49
Båter i denne videoen
Mer fra Sail Life
Fra Sail Life – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



