Sail Lifevideo

⛵️ DIY Container Workshop: Ava is back in town! Floors, insulation, paneling, and paint. Ep 652

26 ottobre 2025 · 23 min · 75K visualizzazioni

Cosa tratta questo video

Mads and Ava finish the interior build-out of a 40-ft shipping container workshop, installing insulation, flooring, paneling, and a partition door. To insulate the office floors, they install firring strips, 1.5-inch XPS foam, and OSB subflooring, sealing gaps with spray foam to prevent condensation.3:03 For the walls and ceiling, they install faux shiplap paneling using a drywall hoist and construction adhesive.8:38 A solid-core pre-hung door separates the workshop from the office, with shims used to ensure the frame is plumb before securing it with 3-inch screws.12:48 Mads runs electrical wiring through EMT conduit for an industrial aesthetic, while Ava finishes the interior with paint.14:21 The project concludes with the installation of luxury vinyl plank flooring.16:43 The build utilizes a WaterSaw, a foldable tool compatible with standard reciprocating saw blades, for cutting foam and other materials.18:49

Guarda su YouTube

Barche in questo video

Antares Yachts 44La loro barca

Altro da Sail Life

The road back to boat work: Bunker roof, done! Ep. 699ott 2026The road back to boat work: A bunker surprise. Ep. 698ott 2026BUNKER vs. LASER - xTool MetalFab laser welder and CNC Ep. 697set 2026The road back to boat work: Bunker Makeover! Ep. 696set 2026

Da Sail Life — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema