Sail Lifevideo

⛵️ DIY Container Workshop: Ava is back in town! Floors, insulation, paneling, and paint. Ep 652

October 26, 2025 · 23 min · 75K views

What this video covers

Mads and Ava finish the interior build-out of a 40-ft shipping container workshop, installing insulation, flooring, paneling, and a partition door. To insulate the office floors, they install firring strips, 1.5-inch XPS foam, and OSB subflooring, sealing gaps with spray foam to prevent condensation.3:03 For the walls and ceiling, they install faux shiplap paneling using a drywall hoist and construction adhesive.8:38 A solid-core pre-hung door separates the workshop from the office, with shims used to ensure the frame is plumb before securing it with 3-inch screws.12:48 Mads runs electrical wiring through EMT conduit for an industrial aesthetic, while Ava finishes the interior with paint.14:21 The project concludes with the installation of luxury vinyl plank flooring.16:43 The build utilizes a WaterSaw, a foldable tool compatible with standard reciprocating saw blades, for cutting foam and other materials.18:49

Watch on YouTube

Boats in this video

Antares Yachts 44Their boat

More from Sail Life

Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693Aug 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692Aug 2026The road back to boat work: Cutting trees, picking up plywood, and 240V in the shop. Ep. 691Aug 2026Our Mammotion LUBA 3 AWD is going to save us so a lot of time!Aug 2026

From Sail Life — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue