Wildling Sailingvideo

Launching My Unfinished Project Catamaran | Wildling Sailing

8. september 2023 · 26 min · 136K visninger

Hva denne videoen dekker

A project catamaran undergoes final preparation for a launch, including raising the waterline by 10cm, sanding the hull, and applying epoxy primer and hard anti-fouling paint.1:06 The owner uses yellow masking tape for exterior work, noting that cheaper alternatives fail to hold up to moisture and sun.1:32 After degreasing surfaces with acetone, the owner applies paint to the hull and a structural beam, discovering that failing to prepare a surface leads to bubbling and poor adhesion.8:38 The beam requires planing to fit into its mounting slot, and the owner secures it with 8mm pre-stretched polyester lashing rope following design plans.20:14 Rudders are reinstalled using custom-made plastic spacers and nylon bolts to ensure proper alignment.19:30 Following the launch, the boat remains in the boatyard for winter, with upcoming tasks focused on installing a mast step, learning Dyneema rigging techniques, and finalizing engine boxes.25:11 Proper surface preparation remains the most critical factor in achieving a durable paint finish on fiberglass hulls.

Se på YouTube

Mer fra Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitokt. 2026I Lifted Her Out For a Very Important Rebuild.sep. 2026One Final Refit Before Crossing The Atlantic.aug. 20262 Days Alone at Sea On my Primitive Double-Canoe.aug. 2026

Fra Wildling Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem