Wildling Sailingvídeo
Launching My Unfinished Project Catamaran | Wildling Sailing
8 de septiembre de 2023 · 26 min · 136K visitas
Qué cubre este vídeo
A project catamaran undergoes final preparation for a launch, including raising the waterline by 10cm, sanding the hull, and applying epoxy primer and hard anti-fouling paint.1:06 The owner uses yellow masking tape for exterior work, noting that cheaper alternatives fail to hold up to moisture and sun.1:32 After degreasing surfaces with acetone, the owner applies paint to the hull and a structural beam, discovering that failing to prepare a surface leads to bubbling and poor adhesion.8:38 The beam requires planing to fit into its mounting slot, and the owner secures it with 8mm pre-stretched polyester lashing rope following design plans.20:14 Rudders are reinstalled using custom-made plastic spacers and nylon bolts to ensure proper alignment.19:30 Following the launch, the boat remains in the boatyard for winter, with upcoming tasks focused on installing a mast step, learning Dyneema rigging techniques, and finalizing engine boxes.25:11 Proper surface preparation remains the most critical factor in achieving a durable paint finish on fiberglass hulls.
Más de Wildling Sailing
De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



