Sailing Catalpavideo

Demontering av mastene på seilbåten vår i Mexico Ep 415

21. juli 2024 · 22 min · 11K visninger · Mexico

Hva denne videoen dekker

The crew of the ketch Catalpa removes both the main and mizzen masts while hauled out at a boatyard in Mexico. To ensure precise measurements for new standing rigging, the rigger, Memo, marks all stays before removal to obtain accurate pin-to-pin dimensions for the manufacturer, Hemel, in Australia. The team hires a large mobile crane to lift the masts, which are stepped through the deck rather than deck-stepped, requiring significant vertical clearance to clear the hull. The removal process involves loosening lower shrouds, vertical diagonals, backstays, and forestays while using control lines at the top and bottom of the masts to maintain stability during the lift. During the mizzen mast removal, a control line snaps, requiring the rigger to climb the mast to re-secure it. Once lowered, the masts are placed on sawhorses for inspection and disassembly. The crew notes that the main mast weighs approximately two tons. The project concludes with the crew measuring the old rigging to finalize specifications for the replacement set.

Se på YouTube

Mer fra Sailing Catalpa

they weren't expecting thissep. 2026one of the most remote islands on the planetsep. 202629 days sailing Panama to French Polynesia the whole passageaug. 2026what did we learn from a month at seaaug. 2026

Fra Sailing Catalpa – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem