Sailing Catalpavideo
Demontering av mastene på seilbåten vår i Mexico Ep 415
21. juli 2024 · 22 min · 11K visninger · Mexico
Hva denne videoen dekker
The crew of the ketch Catalpa removes both the main and mizzen masts while hauled out at a boatyard in Mexico. To ensure precise measurements for new standing rigging, the rigger, Memo, marks all stays before removal to obtain accurate pin-to-pin dimensions for the manufacturer, Hemel, in Australia. The team hires a large mobile crane to lift the masts, which are stepped through the deck rather than deck-stepped, requiring significant vertical clearance to clear the hull. The removal process involves loosening lower shrouds, vertical diagonals, backstays, and forestays while using control lines at the top and bottom of the masts to maintain stability during the lift. During the mizzen mast removal, a control line snaps, requiring the rigger to climb the mast to re-secure it. Once lowered, the masts are placed on sawhorses for inspection and disassembly. The crew notes that the main mast weighs approximately two tons. The project concludes with the crew measuring the old rigging to finalize specifications for the replacement set.
Mer fra Sailing Catalpa
Fra Sailing Catalpa – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



