Sailing Catalpavídeo

Desmatação do nosso veleiro no México Ep 415

21 de julho de 2024 · 22 min · 11K visualizações · Mexico

O que este vídeo aborda

The crew of the ketch Catalpa removes both the main and mizzen masts while hauled out at a boatyard in Mexico. To ensure precise measurements for new standing rigging, the rigger, Memo, marks all stays before removal to obtain accurate pin-to-pin dimensions for the manufacturer, Hemel, in Australia. The team hires a large mobile crane to lift the masts, which are stepped through the deck rather than deck-stepped, requiring significant vertical clearance to clear the hull. The removal process involves loosening lower shrouds, vertical diagonals, backstays, and forestays while using control lines at the top and bottom of the masts to maintain stability during the lift. During the mizzen mast removal, a control line snaps, requiring the rigger to climb the mast to re-secure it. Once lowered, the masts are placed on sawhorses for inspection and disassembly. The crew notes that the main mast weighs approximately two tons. The project concludes with the crew measuring the old rigging to finalize specifications for the replacement set.

Ver no YouTube

Mais de Sailing Catalpa

arriving to the most remote atolls on earth...the Tuamotus09/2026they weren't expecting this09/2026one of the most remote islands on the planet09/202629 days sailing Panama to French Polynesia the whole passage08/2026

De Sailing Catalpa — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema