Project Brupegvideo

Fabricating Removable Handrails - Project Brupeg Ep. 440

15. mars 2026 · 41 min · 13K visninger · Horn Island

Hva denne videoen dekker

Fabricating custom stainless steel handrails for the 10-year refit of the fishing trawler Brupeg requires manual pipe notching and TIG welding due to the lack of specialized shop tools and the difficulty of sourcing parts in remote Thursday Island. To create precise joints without a notching tool, the crew uses an angle grinder to manually scallop the pipe ends until they fit snugly against the vertical supports.11:37 They align the rails by welding three small metal lumps onto a bolt to reduce play, allowing for temporary positioning and angle adjustments before final tack welding.29:55 A donated welding rotator simplifies the TIG process by spinning the pipe, ensuring consistent weld penetration.27:22 The crew prioritizes structural integrity to ensure the rails can withstand the weight of multiple people leaning against them.24:28 Because supplies are limited, the project relies on existing onboard stainless stock and salvaged bolts.8:34

Se på YouTube

Mer fra Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456aug. 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455aug. 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454juli 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453juli 2026

Fra Project Brupeg – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem