Project Brupegvideo

Fabricating Removable Handrails - Project Brupeg Ep. 440

15 March 2026 · 41 min · 13K views · Horn Island

What this video covers

Fabricating custom stainless steel handrails for the 10-year refit of the fishing trawler Brupeg requires manual pipe notching and TIG welding due to the lack of specialized shop tools and the difficulty of sourcing parts in remote Thursday Island. To create precise joints without a notching tool, the crew uses an angle grinder to manually scallop the pipe ends until they fit snugly against the vertical supports.11:37 They align the rails by welding three small metal lumps onto a bolt to reduce play, allowing for temporary positioning and angle adjustments before final tack welding.29:55 A donated welding rotator simplifies the TIG process by spinning the pipe, ensuring consistent weld penetration.27:22 The crew prioritizes structural integrity to ensure the rails can withstand the weight of multiple people leaning against them.24:28 Because supplies are limited, the project relies on existing onboard stainless stock and salvaged bolts.8:34

Watch on YouTube

More from Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456Aug 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455Aug 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454Jul 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453Jul 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue