Project Brupegvideo
Fabricating Removable Handrails - Project Brupeg Ep. 440
15 March 2026 · 41 min · 13K views · Horn Island
What this video covers
Fabricating custom stainless steel handrails for the 10-year refit of the fishing trawler Brupeg requires manual pipe notching and TIG welding due to the lack of specialized shop tools and the difficulty of sourcing parts in remote Thursday Island. To create precise joints without a notching tool, the crew uses an angle grinder to manually scallop the pipe ends until they fit snugly against the vertical supports.11:37 They align the rails by welding three small metal lumps onto a bolt to reduce play, allowing for temporary positioning and angle adjustments before final tack welding.29:55 A donated welding rotator simplifies the TIG process by spinning the pipe, ensuring consistent weld penetration.27:22 The crew prioritizes structural integrity to ensure the rails can withstand the weight of multiple people leaning against them.24:28 Because supplies are limited, the project relies on existing onboard stainless stock and salvaged bolts.8:34
More from Project Brupeg
From Project Brupeg — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



