kentblairlvideo

Barbashela Floorboard Removal

7. august 2017 · 0 min · 23 visninger

Hva denne videoen dekker

Kent Blair removes a port floorboard from the boat Barbashela to inspect the underlying structural frames.Watch The removed plank reveals significant rot across the majority of the frame sections.0:32 The construction features two distinct sets of frames, suggesting an original configuration supplemented by a later addition.0:37 The notches on the outer edge of the plank accommodate the vertical rise of the frames against the hull.0:16 This inspection confirms extensive wood decay requiring structural attention.0:32

Se på YouTube

Mer fra kentblairl

Bahamas Dinghy HENNING Tape Removalsep. 2026Nutshell Pram Tiller Repair IIjuni 2026Nutshell Pram Tiller Repairjuni 2026Bottle Jack Servicingmai 2026

Fra kentblairl – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem