kentblairlvideo
Barbashela Floorboard Removal
7. august 2017 · 0 min · 23 visninger
Hva denne videoen dekker
Kent Blair removes a port floorboard from the boat Barbashela to inspect the underlying structural frames.Watch The removed plank reveals significant rot across the majority of the frame sections.0:32 The construction features two distinct sets of frames, suggesting an original configuration supplemented by a later addition.0:37 The notches on the outer edge of the plank accommodate the vertical rise of the frames against the hull.0:16 This inspection confirms extensive wood decay requiring structural attention.0:32
Mer fra kentblairl
Fra kentblairl – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



