kentblairlvídeo
Barbashela Floorboard Removal
7 de agosto de 2017 · 0 min · 23 visitas
Qué cubre este vídeo
Kent Blair removes a port floorboard from the boat Barbashela to inspect the underlying structural frames.Watch The removed plank reveals significant rot across the majority of the frame sections.0:32 The construction features two distinct sets of frames, suggesting an original configuration supplemented by a later addition.0:37 The notches on the outer edge of the plank accommodate the vertical rise of the frames against the hull.0:16 This inspection confirms extensive wood decay requiring structural attention.0:32
Más de kentblairl
De kentblairl — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



