kentblairlvideo

Barbashela Floorboard Removal

7 agosto 2017 · 0 min · 23 visualizzazioni

Cosa tratta questo video

Kent Blair removes a port floorboard from the boat Barbashela to inspect the underlying structural frames.Watch The removed plank reveals significant rot across the majority of the frame sections.0:32 The construction features two distinct sets of frames, suggesting an original configuration supplemented by a later addition.0:37 The notches on the outer edge of the plank accommodate the vertical rise of the frames against the hull.0:16 This inspection confirms extensive wood decay requiring structural attention.0:32

Guarda su YouTube

Altro da kentblairl

Bahamas Dinghy HENNING Tape Removalset 2026Nutshell Pram Tiller Repair IIgiu 2026Nutshell Pram Tiller Repairgiu 2026Bottle Jack Servicingmag 2026

Da kentblairl — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema