Sailing Umavideo

4 Days in the Chain Locker: Worst Job Yet! | Step 409

21. september 2024 · 36 min · 136K visninger

Hva denne videoen dekker

The crew of the 38-ft sailboat Uma rebuilds their chain locker to eliminate water ingress into the bilge.0:37 The project involves removing all deck hardware, including the windlass, forestay chain plate, and bowsprit, to address a "swiss cheese" of old, improperly filled holes in the forward deck.12:55 After grinding the underside of the deck, the crew applies three layers of fiberglass to seal the hull-deck joint and create a watertight bulkhead.21:43 They construct a new, elevated floor inside the locker using plywood and expanding foam, positioning it above the waterline.26:48 Finally, they drill two drain holes through the hull, one on each side, to ensure water entering the locker from the chain or deck spray exits overboard rather than draining into the bilge.31:23 This modification isolates the chain locker from the interior, successfully stopping the primary source of bilge water.32:59 Sealing the chain locker and installing dedicated overboard drains prevents saltwater and debris from contaminating the bilge.

Se på YouTube

Mer fra Sailing Uma

We're Finally Setting Sail Again!sep. 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsep. 2026Solar Sponsor Backed Out Before Sailing Around the World !sep. 2026Our boat won’t look the same after this | Step 495aug. 2026

Fra Sailing Uma – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem