Sailing Umavídeo

4 Days in the Chain Locker: Worst Job Yet! | Step 409

21 de septiembre de 2024 · 36 min · 136K visitas

Qué cubre este vídeo

The crew of the 38-ft sailboat Uma rebuilds their chain locker to eliminate water ingress into the bilge.0:37 The project involves removing all deck hardware, including the windlass, forestay chain plate, and bowsprit, to address a "swiss cheese" of old, improperly filled holes in the forward deck.12:55 After grinding the underside of the deck, the crew applies three layers of fiberglass to seal the hull-deck joint and create a watertight bulkhead.21:43 They construct a new, elevated floor inside the locker using plywood and expanding foam, positioning it above the waterline.26:48 Finally, they drill two drain holes through the hull, one on each side, to ensure water entering the locker from the chain or deck spray exits overboard rather than draining into the bilge.31:23 This modification isolates the chain locker from the interior, successfully stopping the primary source of bilge water.32:59 Sealing the chain locker and installing dedicated overboard drains prevents saltwater and debris from contaminating the bilge.

Ver en YouTube

Más de Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496sept 2026We're Finally Setting Sail Again!sept 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsept 2026Solar Sponsor Backed Out Before Sailing Around the World !sept 2026

De Sailing Uma — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema