The crew of the 38-ft sailboat Uma rebuilds their chain locker to eliminate water ingress into the bilge.0:37 The project involves removing all deck hardware, including the windlass, forestay chain plate, and bowsprit, to address a "swiss cheese" of old, improperly filled holes in the forward deck.12:55 After grinding the underside of the deck, the crew applies three layers of fiberglass to seal the hull-deck joint and create a watertight bulkhead.21:43 They construct a new, elevated floor inside the locker using plywood and expanding foam, positioning it above the waterline.26:48 Finally, they drill two drain holes through the hull, one on each side, to ensure water entering the locker from the chain or deck spray exits overboard rather than draining into the bilge.31:23 This modification isolates the chain locker from the interior, successfully stopping the primary source of bilge water.32:59 Sealing the chain locker and installing dedicated overboard drains prevents saltwater and debris from contaminating the bilge.

Regarder sur YouTube

Plus de vidéos de Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496sept. 2026We're Finally Setting Sail Again!sept. 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsept. 2026Solar Sponsor Backed Out Before Sailing Around the World !sept. 2026

De Sailing Uma — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème