MJ Sailingvideo
The Metamorphosis of our Master Berth (MJ Sailing - Ep 333)
6. juli 2024 · 16 min · 44K visninger · Kent Island
Hva denne videoen dekker
The master berth construction on the custom boat involves routing steering cables through the cabin to minimize friction and maximize space.1:26 By running the lines from the pedestal through a new storage cabinet near the steps, the design avoids external enclosures and maintains a straight path for the steering and shifter cables.1:26 The installation includes a dedicated, ventilated, and watertight compartment for the hybrid motor controller to ensure proper cooling.2:59
Structural work requires bonding and glassing fiberglass panels, followed by fairing with Total Fair Epoxy Faring Compound and polyester-based compounds for larger surfaces.7:07 To identify low spots during the fairing process, the crew applies denatured alcohol mixed with blue dye before sanding.8:53 Additional tasks include trimming factory-shipped fiberglass edges along the cabin top to prepare for window installation.9:30 The crew utilizes WBT-2 electric scissors to cut through multiple layers of 12-ounce double-bias fiberglass.15:20 Proper surface preparation, including cleaning with acetone, ensures adhesion for the fairing compound.6:32
Mer fra MJ Sailing
Fra MJ Sailing – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



