MJ Sailingvideo

The Metamorphosis of our Master Berth (MJ Sailing - Ep 333)

6 July 2024 · 16 min · 44K views · Kent Island

What this video covers

The master berth construction on the custom boat involves routing steering cables through the cabin to minimize friction and maximize space.1:26 By running the lines from the pedestal through a new storage cabinet near the steps, the design avoids external enclosures and maintains a straight path for the steering and shifter cables.1:26 The installation includes a dedicated, ventilated, and watertight compartment for the hybrid motor controller to ensure proper cooling.2:59

Structural work requires bonding and glassing fiberglass panels, followed by fairing with Total Fair Epoxy Faring Compound and polyester-based compounds for larger surfaces.7:07 To identify low spots during the fairing process, the crew applies denatured alcohol mixed with blue dye before sanding.8:53 Additional tasks include trimming factory-shipped fiberglass edges along the cabin top to prepare for window installation.9:30 The crew utilizes WBT-2 electric scissors to cut through multiple layers of 12-ounce double-bias fiberglass.15:20 Proper surface preparation, including cleaning with acetone, ensures adhesion for the fairing compound.6:32

Watch on YouTube

More from MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)Aug 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)Jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)Jun 2026Preparing Our Catamaran for Paint—and Me for Captain's SchoolJun 2026

From MJ Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue