MJ Sailingvidéo

The Metamorphosis of our Master Berth (MJ Sailing - Ep 333)

6 juillet 2024 · 16 min · 44K vues · Kent Island

Ce que couvre cette vidéo

The master berth construction on the custom boat involves routing steering cables through the cabin to minimize friction and maximize space.1:26 By running the lines from the pedestal through a new storage cabinet near the steps, the design avoids external enclosures and maintains a straight path for the steering and shifter cables.1:26 The installation includes a dedicated, ventilated, and watertight compartment for the hybrid motor controller to ensure proper cooling.2:59

Structural work requires bonding and glassing fiberglass panels, followed by fairing with Total Fair Epoxy Faring Compound and polyester-based compounds for larger surfaces.7:07 To identify low spots during the fairing process, the crew applies denatured alcohol mixed with blue dye before sanding.8:53 Additional tasks include trimming factory-shipped fiberglass edges along the cabin top to prepare for window installation.9:30 The crew utilizes WBT-2 electric scissors to cut through multiple layers of 12-ounce double-bias fiberglass.15:20 Proper surface preparation, including cleaning with acetone, ensures adhesion for the fairing compound.6:32

Regarder sur YouTube

Plus de vidéos de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)août 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juil. 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juin 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuin 2026

De MJ Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème