sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn
sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026

HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn

Sailing Yabá · video

Building Traditional Wooden Gaffs for Our +80ft Boat — Sailing Yabá

22. februar 2026 · 35 min · 62K visninger · shipyard

Ben and Nico carry timber across muddy shipyard near Yabá.

Se på YouTube

Hva denne videoen dekker

Ben and Nico build a pair of wooden gaffs from scratch aboard Yabá, an 80-plus-foot traditional wooden vessel, at a Brazilian shipyard — the first step in converting the boat from its failing existing rig to a gaff rig before sailing the full Brazilian coast from south to north. Master shipwright Zeca is sidelined by an injury, leaving Ben to lead the work.▶ 3:58 The process runs from laminating four planks with epoxy and clamps, squaring the blanks to 9 cm × 9 cm on a planer, scribing centerlines with a marking gauge (called a graminho in Portuguese), and progressively planing the corners to an octagon before grinding to a near-round section.▶ 8:13 Custom metal rings are drawn up and sent to a welder; final shaping waits on that metalwork.▶ 29:07 Parallel work includes stripping old varnish and switching from a 10-coat conventional varnish — which failed in under two years — to Cetol, chosen for its recoat-without-stripping maintenance cycle.▶ 16:48 Deck caulking compound that has separated from the planks is also addressed.▶ 29:31 A neap tide prevents hauling Yabá onto the crib; the crew waits for spring tide, with high water rising 10 cm per day.▶ 19:56 The episode ends before the boom build and gaff jaw shaping begin.

Mer fra Sailing Yabá

the hardest video we ever made.juni 2026She's Floating Again! — Sailing Yabájuni 2026One Last Job Before We Launch Our Wooden Boat — Sailing Yabámai 2026We NEED to Get This Boat Ready to Float NOW! — Sailing Yabámai 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026