sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Sailing Yabá · vídeo

Building Traditional Wooden Gaffs for Our +80ft Boat — Sailing Yabá

22 de fevereiro de 2026 · 35 min · 62K visualizações · shipyard

Ben and Nico carry timber across muddy shipyard near Yabá.

Ver no YouTube

O que este vídeo aborda

Ben and Nico build a pair of wooden gaffs from scratch aboard Yabá, an 80-plus-foot traditional wooden vessel, at a Brazilian shipyard — the first step in converting the boat from its failing existing rig to a gaff rig before sailing the full Brazilian coast from south to north. Master shipwright Zeca is sidelined by an injury, leaving Ben to lead the work.▶ 3:58 The process runs from laminating four planks with epoxy and clamps, squaring the blanks to 9 cm × 9 cm on a planer, scribing centerlines with a marking gauge (called a graminho in Portuguese), and progressively planing the corners to an octagon before grinding to a near-round section.▶ 8:13 Custom metal rings are drawn up and sent to a welder; final shaping waits on that metalwork.▶ 29:07 Parallel work includes stripping old varnish and switching from a 10-coat conventional varnish — which failed in under two years — to Cetol, chosen for its recoat-without-stripping maintenance cycle.▶ 16:48 Deck caulking compound that has separated from the planks is also addressed.▶ 29:31 A neap tide prevents hauling Yabá onto the crib; the crew waits for spring tide, with high water rising 10 cm per day.▶ 19:56 The episode ends before the boom build and gaff jaw shaping begin.

Mais de Sailing Yabá

the hardest video we ever made.06/2026She's Floating Again! — Sailing Yabá06/2026One Last Job Before We Launch Our Wooden Boat — Sailing Yabá05/2026We NEED to Get This Boat Ready to Float NOW! — Sailing Yabá05/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026