sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter
sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026

AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory
ChaînesBateauxDemanderÀ propos
🇫🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Se connecter

Sailing Yabá · vidéo

Building Traditional Wooden Gaffs for Our +80ft Boat — Sailing Yabá

22 février 2026 · 35 min · 62K vues · shipyard

Ben and Nico carry timber across muddy shipyard near Yabá.

Regarder sur YouTube

Ce que couvre cette vidéo

Ben and Nico build a pair of wooden gaffs from scratch aboard Yabá, an 80-plus-foot traditional wooden vessel, at a Brazilian shipyard — the first step in converting the boat from its failing existing rig to a gaff rig before sailing the full Brazilian coast from south to north. Master shipwright Zeca is sidelined by an injury, leaving Ben to lead the work.▶ 3:58 The process runs from laminating four planks with epoxy and clamps, squaring the blanks to 9 cm × 9 cm on a planer, scribing centerlines with a marking gauge (called a graminho in Portuguese), and progressively planing the corners to an octagon before grinding to a near-round section.▶ 8:13 Custom metal rings are drawn up and sent to a welder; final shaping waits on that metalwork.▶ 29:07 Parallel work includes stripping old varnish and switching from a 10-coat conventional varnish — which failed in under two years — to Cetol, chosen for its recoat-without-stripping maintenance cycle.▶ 16:48 Deck caulking compound that has separated from the planks is also addressed.▶ 29:31 A neap tide prevents hauling Yabá onto the crib; the crew waits for spring tide, with high water rising 10 cm per day.▶ 19:56 The episode ends before the boom build and gaff jaw shaping begin.

Plus de vidéos de Sailing Yabá

the hardest video we ever made.juin 2026She's Floating Again! — Sailing Yabájuin 2026One Last Job Before We Launch Our Wooden Boat — Sailing Yabámai 2026We NEED to Get This Boat Ready to Float NOW! — Sailing Yabámai 2026

De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

Signaler un problème
AccueilChaînesBateaux

Plus

RechercheDemanderÀ proposSoutenirPour les créateursSe connecter

Langue

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Mode d'affichage

sailing.directory

Un index des chaînes de voile sur YouTube — interrogeable par sujet, navigable par centre d'intérêt. Nouvelles chaînes et nouveaux bateaux, indexés chaque semaine. Sans bruit.

Explorer

ChaînesBateauxRechercheÀ proposSuggérer une chaîne

Créateurs & mentions légales

SoutenirPour les créateursConfidentialitéConditionsDMCA

Ceci n'est pas un conseil de navigation · © 2026