Wildling Sailingvideo

Getting My Double-Canoe Ready for the Ocean!

4. april 2025 · 30 min · 253K visninger

Hva denne videoen dekker

Arthur prepares his double-canoe for an upcoming ocean passage by completing several structural and rigging modifications. He replaces temporary self-tapping screws on the mast gooseneck with A2 stainless steel machine screws, drilling and tapping the holes for a secure fit.3:32 To manage the mainsheet, he lashes blocks to the boom using Dyneema to distribute strain across the spar rather than relying on surface-mounted fittings.6:14 After discovering that the steering linkage had pulled away from the hull due to excessive tension, he installs an 8mm through-bolt with a multi-layered backing plate to reinforce the connection.11:32 He also constructs an aft deck using weather-resistant Douglas fir planks, incorporating rubber patches to protect the hull and rounding the edges to improve aesthetics and functionality.17:52 The project list includes upcoming tasks such as installing a new inner forestay and mounting an engine.23:40 The owner plans to test the rigging adjustments on local lakes before departing for a planned June voyage.29:48

Se på YouTube

Mer fra Wildling Sailing

One Final Refit Before Crossing The Atlantic.aug. 20262 Days Alone at Sea On my Primitive Double-Canoe.aug. 2026A Night Passage Through Orca Territoryjuli 2026Getting Very Comfortable Solo Sailing My Big Catamaranjuli 2026

Fra Wildling Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem