Wildling Sailingvideo

Getting My Double-Canoe Ready for the Ocean!

4 April 2025 · 30 min · 253K views

What this video covers

Arthur prepares his double-canoe for an upcoming ocean passage by completing several structural and rigging modifications. He replaces temporary self-tapping screws on the mast gooseneck with A2 stainless steel machine screws, drilling and tapping the holes for a secure fit.3:32 To manage the mainsheet, he lashes blocks to the boom using Dyneema to distribute strain across the spar rather than relying on surface-mounted fittings.6:14 After discovering that the steering linkage had pulled away from the hull due to excessive tension, he installs an 8mm through-bolt with a multi-layered backing plate to reinforce the connection.11:32 He also constructs an aft deck using weather-resistant Douglas fir planks, incorporating rubber patches to protect the hull and rounding the edges to improve aesthetics and functionality.17:52 The project list includes upcoming tasks such as installing a new inner forestay and mounting an engine.23:40 The owner plans to test the rigging adjustments on local lakes before departing for a planned June voyage.29:48

Watch on YouTube

More from Wildling Sailing

One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026A Night Passage Through Orca TerritoryJul 2026Getting Very Comfortable Solo Sailing My Big CatamaranJul 2026

From Wildling Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue