Wind Hippie Sailingvideo

Installing My New Rolly Tasker Sail I Used My Old Sail Until it Fell Apart

22. mai 2023 · 17 min · 60K visninger · New Zealand

Hva denne videoen dekker

A damaged mainsail on a 38-ft sloop, which had been patched repeatedly with sail tape and contact cement during a passage from Fiji to New Zealand, required replacement after the leech line tore during a 40-knot squall.1:52 To obtain precise measurements for a new sail, the owner climbed the mast while anchored in a high-current river, using a tape measure to record dimensions and reef point locations.8:37 Rolly Tasker Sails provided a replacement mainsail, which featured a loose-footed design and flat slides to prevent the jamming issues experienced with the boat's original circular slides.12:36 The installation included running new reef lines and testing the fit before a planned 1,100-mile passage to Vanuatu.14:59 The owner also discovered that a previously acquired, high-quality working jib found in a North Carolina marine salvage store was also manufactured by Rolly Tasker.15:36 Measuring a sail from the masthead allows for accurate dimensions while simultaneously enabling a full rig inspection.

Se på YouTube

Mer fra Wind Hippie Sailing

In and Out and In Again WHS186aug. 2026What I Found Inside the Stern Tube Changed Everything WHSE184juli 2026Motoring Caused the Leak… So We Motored to Fix It WHSE183juli 2026Back to the Boat, Back to the Journey WHSE182juni 2026

Fra Wind Hippie Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem