Wind Hippie Sailingvídeo

Installing My New Rolly Tasker Sail I Used My Old Sail Until it Fell Apart

22 de maio de 2023 · 17 min · 60K visualizações · New Zealand

O que este vídeo aborda

A damaged mainsail on a 38-ft sloop, which had been patched repeatedly with sail tape and contact cement during a passage from Fiji to New Zealand, required replacement after the leech line tore during a 40-knot squall.1:52 To obtain precise measurements for a new sail, the owner climbed the mast while anchored in a high-current river, using a tape measure to record dimensions and reef point locations.8:37 Rolly Tasker Sails provided a replacement mainsail, which featured a loose-footed design and flat slides to prevent the jamming issues experienced with the boat's original circular slides.12:36 The installation included running new reef lines and testing the fit before a planned 1,100-mile passage to Vanuatu.14:59 The owner also discovered that a previously acquired, high-quality working jib found in a North Carolina marine salvage store was also manufactured by Rolly Tasker.15:36 Measuring a sail from the masthead allows for accurate dimensions while simultaneously enabling a full rig inspection.

Assistir no YouTube

Mais de Wind Hippie Sailing

In and Out and In Again WHS186ago. de 2026What I Found Inside the Stern Tube Changed Everything WHSE184jul. de 2026Motoring Caused the Leak… So We Motored to Fix It WHSE183jul. de 2026Back to the Boat, Back to the Journey WHSE182jun. de 2026

De Wind Hippie Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema