Wind Hippie Sailingvideo

Installing My New Rolly Tasker Sail I Used My Old Sail Until it Fell Apart

22 May 2023 · 17 min · 60K views · New Zealand

What this video covers

A damaged mainsail on a 38-ft sloop, which had been patched repeatedly with sail tape and contact cement during a passage from Fiji to New Zealand, required replacement after the leech line tore during a 40-knot squall.1:52 To obtain precise measurements for a new sail, the owner climbed the mast while anchored in a high-current river, using a tape measure to record dimensions and reef point locations.8:37 Rolly Tasker Sails provided a replacement mainsail, which featured a loose-footed design and flat slides to prevent the jamming issues experienced with the boat's original circular slides.12:36 The installation included running new reef lines and testing the fit before a planned 1,100-mile passage to Vanuatu.14:59 The owner also discovered that a previously acquired, high-quality working jib found in a North Carolina marine salvage store was also manufactured by Rolly Tasker.15:36 Measuring a sail from the masthead allows for accurate dimensions while simultaneously enabling a full rig inspection.

Watch on YouTube

More from Wind Hippie Sailing

In and Out and In Again WHS186Aug 2026What I Found Inside the Stern Tube Changed Everything WHSE184Jul 2026Motoring Caused the Leak… So We Motored to Fix It WHSE183Jul 2026Back to the Boat, Back to the Journey WHSE182Jun 2026

From Wind Hippie Sailing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue