MJ Sailingvideo

Finishing the Settee....AND THEN... (MJ Sailing - Ep 318)

20. januar 2024 · 13 min · 59K visninger · Kent Island

Hva denne videoen dekker

Construction of the salon settee involves bonding and fiberglassing a 7.5-foot seat back to the existing furniture structure.6:38 After securing a compression post and backing plate, the crew prepares the foam-core fiberglass panels by sanding and applying thickened resin to the edges.Watch To ensure proper thermal management for the lithium iron phosphate battery bank and the inverter-charger, the design incorporates a chimney-style ventilation system.1:57 This includes intake holes in the settee front, airflow paths through internal bulkheads, and a raised vent at the top to prevent water ingress from overhead hatches.4:19 The seat back is held in place with cleats and wedges while the resin cures, then structurally reinforced with two layers of 12-ounce double-bias fiberglass and peel ply.8:35 Although the salon project is currently paused due to an unspecified event requiring the storage of personal belongings in the living space, the crew continues fairing work in the master head and aft-berth.12:34

Se på YouTube

Mer fra MJ Sailing

The Ultimate Off-Grid Upgrade: Unboxing 8 Lithium Batteries!okt. 2026How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)aug. 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juli 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juni 2026

Fra MJ Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem