MJ Sailingvideo
Finishing the Settee....AND THEN... (MJ Sailing - Ep 318)
January 20, 2024 · 13 min · 59K views · Kent Island
What this video covers
Construction of the salon settee involves bonding and fiberglassing a 7.5-foot seat back to the existing furniture structure.6:38 After securing a compression post and backing plate, the crew prepares the foam-core fiberglass panels by sanding and applying thickened resin to the edges.Watch To ensure proper thermal management for the lithium iron phosphate battery bank and the inverter-charger, the design incorporates a chimney-style ventilation system.1:57 This includes intake holes in the settee front, airflow paths through internal bulkheads, and a raised vent at the top to prevent water ingress from overhead hatches.4:19 The seat back is held in place with cleats and wedges while the resin cures, then structurally reinforced with two layers of 12-ounce double-bias fiberglass and peel ply.8:35 Although the salon project is currently paused due to an unspecified event requiring the storage of personal belongings in the living space, the crew continues fairing work in the master head and aft-berth.12:34
More from MJ Sailing
From MJ Sailing — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



