MJ Sailingvideo

Finishing the Settee....AND THEN... (MJ Sailing - Ep 318)

20 gennaio 2024 · 13 min · 59K visualizzazioni · Kent Island

Cosa tratta questo video

Construction of the salon settee involves bonding and fiberglassing a 7.5-foot seat back to the existing furniture structure.6:38 After securing a compression post and backing plate, the crew prepares the foam-core fiberglass panels by sanding and applying thickened resin to the edges.Watch To ensure proper thermal management for the lithium iron phosphate battery bank and the inverter-charger, the design incorporates a chimney-style ventilation system.1:57 This includes intake holes in the settee front, airflow paths through internal bulkheads, and a raised vent at the top to prevent water ingress from overhead hatches.4:19 The seat back is held in place with cleats and wedges while the resin cures, then structurally reinforced with two layers of 12-ounce double-bias fiberglass and peel ply.8:35 Although the salon project is currently paused due to an unspecified event requiring the storage of personal belongings in the living space, the crew continues fairing work in the master head and aft-berth.12:34

Guarda su YouTube

Altro da MJ Sailing

The Ultimate Off-Grid Upgrade: Unboxing 8 Lithium Batteries!ott 2026How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)lug 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)giu 2026

Da MJ Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema