DEVASTATING NEWS - Our Pacific Crossing May Be Canceled - (Episode 217)
9 de julho de 2023 · 19 min · 210K visualizações · Puerto Vallarta
O que este vídeo aborda
The crew of the Lagoon 450 *Parlay Revival* prepares for a 2,600-mile Pacific crossing from Mexico to the Marquesas Islands, only to face a critical rigging failure days before departure. While conducting a final rig inspection at La Cruz Marina, a professional rigger identifies a hairline crack in a cap shroud swage fitting, evidenced by rust seepage.18:07 The discovery forces the crew to delay their passage, as the required 16mm stainless steel standing rigging is unavailable in Mexico and must be sourced from the United States.18:33 Prior to this setback, the crew completed extensive preparations, including provisioning for eight people and two dogs, installing a Starlink maritime dish, and replacing all running rigging with Dyneema lines from Precision Sails.8:13 They also inflated new inflatable fenders from PYI and performed a break-in procedure on a new 9.8hp Tohatsu outboard for their Highfield dinghy.15:52 The crew now faces a narrow seasonal weather window to complete the crossing.18:53
Barcos neste vídeo
Mais de Sailing Parlay Revival
De Sailing Parlay Revival — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



