kentblairlvídeo

1953 Alcort Sunfish ZIP 30 May 20 Construction Notes

31 de maio de 2020 · 9 min · 47 visualizações

O que este vídeo aborda

Restoration of a 1953 pre-production Alcort Sunfish, specifically hull number 13 of 20, requires careful attention to the original structural design and drainage systems. The deck attaches primarily to internal stringers and frames, leaving a small gap between the deck and frames that serves as a limber hole for water drainage.1:54 Builders should avoid sealing these gaps, as the early design relies on these channels to direct water toward the cockpit for manual sponging.2:49 The internal structure features 1 1/4-inch thick frames, with 1 1/2-inch thick frames supporting the cockpit.7:09 A 3-inch wide longitudinal member, or longeron, runs along the centerline of both the deck and the keel, providing the primary support for the mast step and daggerboard trunk.6:12 When repairing the stringers, feather the edges back approximately 2 inches to ensure a smooth transition for patch pieces.0:46 Using wax paper to create a pattern for the patch ensures a precise fit before final installation.1:06

Assistir no YouTube

Barcos neste vídeo

Alcort SunfishRevisado

Mais de kentblairl

Bahamas Dinghy HENNING Tape Removalset. de 2026Nutshell Pram Tiller Repair IIjun. de 2026Nutshell Pram Tiller Repairjun. de 2026Bottle Jack Servicingmai. de 2026

De kentblairl — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema