Sailing Zataravídeo
COPPERCOAT: Our THIRD try at antifouling! (Ep 242)
15 de junho de 2023 · 21 min · 321K visualizações
O que este vídeo aborda
The crew of Zatara performs extensive maintenance during a haul-out at Olympic Marine, focusing on antifouling, rigging, and mechanical repairs. Technicians apply Coppercoat to the hull, requiring multiple thin coats followed by sanding to activate the copper for growth prevention.10:08 The crew replaces aging Dyneema davit lines after a dinghy failure and installs new Lumitec lighting on the transom.1:24 Mechanical tasks include replacing sacrificial zinc anodes on the propeller shafts to mitigate electrolysis and installing a new furler motor, though the accompanying foil and swivel installation remains incomplete due to a scheduling conflict with a subcontractor.8:55 The crew also resolves a windlass gypsy fitment issue with new Chrome Mox chain by grinding the chain-well pockets.4:27 Additional preparations for upcoming guests include replacing all cabin bedding and applying Propspeed to the propellers and shafts.17:53 The vessel remains on the hard for polishing, waxing, and final hull preparation before the scheduled splash date.7:04
Mais de Sailing Zatara
De Sailing Zatara — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



