I just Want to SAIL AWAY X Sailing Doodles
21 de setembro de 2025 · 18 min · 38K visualizações · Puerto Vallarta
O que este vídeo aborda
The crew of the classic boat Miss Lone Star performs extensive maintenance and organization in Puerto Vallarta to prepare for upcoming passages. Exterior work includes stripping and re-varnishing hatches, doors, and mast-related components, while addressing dry rot and repairing teak trim with epoxy resin.6:20 The team also plans to polish the hull and remove rust spots from the gel coat.6:44 A mechanic is scheduled to diagnose an oil leak into the closed coolant system.6:29 To improve living space and weight distribution, the crew conducts a deep purge of interior cupboards and drawers, removing unused gear and organizing essential items.14:02 The project involves hand-sanding wood surfaces to avoid damage caused by power tools and replacing a double sink to improve galley functionality.9:43 These efforts aim to restore the vessel's structural integrity and simplify life aboard before future voyages.
Mais de Sailing Miss Lone Star
De Sailing Miss Lone Star — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



